Goto Section: 90.355 | 90.359 | Table of Contents

FCC 90.357
Revised as of September 1, 2021
Goto Year:2020 | 2022
  §  90.357   Frequencies for LMS systems in the 902-928 MHz band.

   (a) Multilateration LMS systems will be authorized on the following LMS
   sub-bands:
        LMS sub-band         Forward link^1
   904.000-909.750 MHz    927.750-928.000 MHz.
   919.750-921.750 MHz.^2 927.500-927.750 MHz.
   921.750-927.250 MHz    927.250-927.500 MHz.

   ^1Forward links for LMS systems may also be contained within the LMS
   sub-band. However, the maximum allowable power in these sub-bands is 30
   Watts ERP in accordance with § 90.205(l).

   ^2The frequency band 919.750-921.750 MHz is shared co-equally between
   multilateration and non-multilateration LMS systems.

   (b) Non-multilateriation LMS systems will be authorized in the
   following frequency bands:
     LMS Sub-band^1
   902.000-904.000 MHz
   909.750-921.750 MHz

   ^1Applicants for non-multilateration LMS systems should request only
   the minimum amount of bandwidth necessary to meet their operational
   needs.

   [ 72 FR 35198 , June 27, 2007, as amended at  75 FR 19284 , Apr. 14, 2010]

   


Goto Section: 90.355 | 90.359

Goto Year: 2020 | 2022
CiteFind - See documents on FCC website that cite this rule

Want to support this service?
Thanks!

Report errors in this rule. Since these rules are converted to HTML by machine, it's possible errors have been made. Please help us improve these rules by clicking the Report FCC Rule Errors link to report an error.
hallikainen.com
Helping make public information public